| in cubic yards | 263,000 | 238,995 | 517,000 Cast metal used in tunnel, including | | | cast iron and cast steel, in tons | | 64,265 | Steel bolts used, in tons | | 2,606 | Cement used (concrete and grout), | | | in barrels | 95,000 | 145,500 | 33,000 Concrete, in cubic yards | 95,000 | 75,400 | 18,500 Dynamite for blasting, in pounds | 600,000 | 100,400 | 206,000 Brickwork, in cubic yards | | 4,980 | Structural steel (including Pier 72), | | | in pounds | 50,000 | 3,141,000 | 1,475,000 ------------------------------------------+---------+-----------+---------- The number of passengers carried on the Elevated Railroad and surface lines of Ninth Avenue during the underpinning of these structures was about 125,000,000. The Board of Engineers, organized by the Pennsylvania Railroad Company in January, 1902, immediately took up the matter of route and grade. The center line, which had been assumed as the center line of 32d Street extended westward, was slightly changed. The grade adopted was approximately 2% descending westward from Ninth Avenue, which would place the tunnel well below the Government dredging plane of 40 ft. below mean low water at the pier head line; thence westward on a lighter grade still descending until the deepest portion of the river was reached where the top of the rail would be about 90 ft. below mean high water, this location giving sufficient cover over the tunnels to insure stability and guard against the possibility of shipwrecks settling on the tunnels. From this point to the portal an ascending grade of 1.30% was adopted, which gave the lines sufficient elevation to cross over the tracks of the New York, Susquehanna and Western and the Erie Railroads, which run along the westerly base of the Palisades. Owing to the exigencies of construction, these grades in the river were very slightly modified. Plate VII is a plan and profile of the tunnels as constructed. [Illustration: Plate VII.--Plan, Profile, and Triangulation, North River Tunnels] The Board of Engineers early in 1902 took up the question of supports for the tunnels under the North River, and various plans and schemes were considered.
PREV.   NEXT  
|<   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   >>  



Top keywords:

tunnels

 

westward

 

slightly

 

including

 

tunnel

 

sufficient

 

descending

 

adopted

 

Engineers

 
center

Railroad
 
Avenue
 

pounds

 
portion
 

settling

 
shipwrecks
 
location
 

portal

 

deepest

 

possibility


stability

 

giving

 
insure
 
reached
 

Susquehanna

 

constructed

 

Illustration

 

Profile

 

profile

 

modified


Triangulation

 

Tunnels

 

schemes

 

considered

 

question

 

supports

 

grades

 
construction
 

tracks

 

elevation


Western

 

Palisades

 
exigencies
 

westerly

 

Railroads

 

ascending

 
Structural
 
Brickwork
 

Elevated

 
surface