bulkheads with air-locks inside the cast-iron linings just east of the portals. Before erecting the bulkheads it was necessary to close the annular space between the iron tunnel lining and the rock. The space at the portal was filled with a concrete wall. After about twenty permanent rings had been erected in each tunnel, two rings were pulled apart at the tail of the shield and a second masonry wall or dam was built. The space between the two dams was then filled with grout. To avoid the possibility of pushing the iron backward after the air pressure was on, rings of segmental plates, 5/8 in. thick and 13-7/8 in. wide, were inserted in eighteen circumferential joints in each tunnel between the rings as they were erected. The plates contained slotted holes to match those in the segments. After the rings left the shield, the plates were driven outward, and projected about 5 in. When the tunnel was grouted, the plates were embedded. The bulkheads were completed, and the tunnels were put under air pressure on the following dates: Line _D_, on October 5th, 1905; Line _C_, on November 6th, 1905; Line _B_, on November 25th, 1905; Line _A_, on December 1st, 1905. This marked the end of the preparatory period. In the deepest part of the river, near the pier-head line on the Manhattan side, there was only 8 ft. of natural cover over the tops of the tunnels. This cover consisted of the fine sand previously described, and it was certain that the air would escape freely from the tunnels through it. To give a greater depth of cover and to check the loss of air, the contractor prepared to cover the lines of the tunnels with blankets of clay, which, however, had been provided for in the specifications. Permits, as described later, were obtained at different times from the Secretary of War, for dumping clay in varying thicknesses over the line of work. The dumping for the blanket allowed under the first permit was completed in February, 1906. The thickness of this blanket varied considerably, but averaged 10 or 12 ft. on the Manhattan side. The original blanket was of material advantage, but the depth of clay was insufficient to stop the loss of air. The essential parts of the shields in the four tunnels were exactly alike. Those in Tunnels _B_ and _D_, however, were originally fitted with sectional sliding hoods and sliding extensions to the floors of the working chambers, as shown by Fig. 1, Plate LXV. The shields in Tunn
PREV.   NEXT  
|<   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41  
42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60   61   62   63   64   65   66   >>   >|  



Top keywords:
tunnels
 

tunnel

 

plates

 

blanket

 

bulkheads

 

November

 
dumping
 

shields

 

pressure

 

shield


completed

 

filled

 

sliding

 

Manhattan

 
erected
 

specifications

 

blankets

 

chambers

 

provided

 

freely


previously
 

consisted

 

escape

 
contractor
 
greater
 

Permits

 

prepared

 

working

 

advantage

 

insufficient


essential

 

material

 

original

 

averaged

 

Tunnels

 

originally

 

fitted

 
extensions
 

considerably

 

varying


thicknesses

 

sectional

 
Secretary
 
obtained
 

allowed

 

varied

 
floors
 

thickness

 
permit
 

February