ime, and record the latter as the stopping time. If the water level is not the same as at the beginning a correction should be made by computation, rather than by feeding additional water after the final readings are taken. Finally remove the ashes and refuse from the ashpit. In a plant containing several boilers where it is not practicable to clean them simultaneously, the fires should be cleaned one after the other as rapidly as may be, and each one after cleaning charged with enough coal to maintain a thin fire in good working condition. After the last fire is cleaned and in working condition, burn all the fires low (say 4 to 6 inches), note quickly the thickness of each, also the water levels, steam pressure, and time, which last is taken as the starting time. Likewise when the time arrives for closing the test, the fires should be quickly cleaned one by one, and when this work is completed they should all be burned low the same as the start, and the various observations made as noted. In the case of a large boiler having several furnace doors requiring the fire to be cleaned in sections one after the other, the above directions pertaining to starting and stopping in a plant of several boilers may be followed. To obtain the desired equality of conditions of the fire when a mechanical stoker other than a chain grate is used, the procedure should be modified where practicable as follows: Regulate the coal feed so as to burn the fire to the low condition required for cleaning. Shut off the coal-feeding mechanism and fill the hoppers level full. Clean the ash or dump plate, note quickly the depth and condition of the coal on the grate, the water level,[66] the steam pressure, and the time, and record the latter as the starting time. Then start the coal-feeding mechanism, clean the ashpit, and proceed with the regular work of the test. When the time arrives for the close of the test, shut off the coal-feeding mechanism, fill the hoppers and burn the fire to the same low point as at the beginning. When this condition is reached, note the water level, the steam pressure, and the time, and record the latter as the stopping time. Finally clean the ashplate and haul the ashes. In the case of chain grate stokers, the desired operating conditions should be maintained for half
PREV.   NEXT  
|<   298   299   300   301   302   303   304   305   306   307   308   309   310   311   312   313   314   315   316   317   318   319   320   321   322  
323   324   325   326   327   328   329   330   331   332   333   334   335   336   337   338   339   340   341   342   343   344   345   346   347   >>   >|  



Top keywords:

condition

 

feeding

 

cleaned

 

mechanism

 
pressure
 

starting

 

quickly

 

record

 
stopping
 

beginning


hoppers
 
working
 

arrives

 

conditions

 

desired

 

boilers

 

Finally

 

practicable

 

cleaning

 

ashpit


operating
 

obtain

 

Regulate

 

stokers

 

procedure

 

stoker

 
maintained
 
equality
 

mechanical

 
modified

ashplate

 

pertaining

 
proceed
 

regular

 

required

 
reached
 
maintain
 

additional

 

computation

 

charged


remove

 

refuse

 

simultaneously

 
rapidly
 

readings

 
inches
 

boiler

 

observations

 

furnace

 
sections