| | | | Mar. 19, 1906.|May 28, 1906. | 70 | 58 | 0.8 | | | | | | | | | | | | | | | | {May 29, 1906.|July 3, 1906.[E]}| 208 | 1,206 | 5.8 | {July 18, 1906.|July 31, 1906. }| | | | {Aug. 12, 1906.|Nov. 23, 1906. }| | | | {Jan. 15, 1907.|Feb. 5, 1907. }| | | | {Feb. 17, 1907.|Mar. 21, 1907. }| | | | | | | | | Dec. 1, 1905.|May. 10, 1906. | 161 | 225 | 1.4 | | | | | | | | | | | Feb. 1, 1907.|Sept.13, 1907. | 225 | 1,033 | 4.6 | | | | | | | | | | | }Feb. 1, 1908.|Feb. 14, 1908. | 14 | 65 | 4.6 | } | | | | | | | | | | }Feb. 15, 1908.|Apr. 14, 1908. | 59 | 524 | 8.9 | } | | | | | | | | | | ====================================================================== [Footnote E: Time and distance omitted while working through timbered stretches.] ======================================================= 8 ------------------------------------------------------- Methods and conditions. ------------------------------------------------------- Top heading and bench. Muck loaded by hand. " " " " " " " " Double heading and bench. Muck loaded by steam shovel. Stretches aggregating 200 ft. narrowed to about 25 ft. and later enlarged are included. Excavation about 30 ft. wide. Top full-width heading and bench. Muck loaded by hand. Steam shovel not installed. Excavation about 30 to 35 ft. wide. Top full-width by hand and part by steam shovel. Double heading an
PREV.   NEXT  
|<   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   >>  



Top keywords:
heading
 

shovel

 

loaded

 

Double

 

Excavation


timbered

 
installed
 

stretches

 

Methods

 

conditions


narrowed

 

enlarged

 

Stretches

 

included

 
aggregating

Footnote

 

distance

 

working

 

omitted