09 | | | | | | | |
Conditions--Day-work| | | | | | | | | | | | | | |
for a contractor. | | | | | | | | | | | | | | |
By previous | | | | | | | | | | | | | | |
observation |a|1.24|1.24|13 |a|2.05 |0.13 |13 | | | | | | |
An average barrow | | | | | | | | | | | | | | |
load of sand is | | | | | | | | | | | | | | |
2.32 cu. ft. | | | | | | | | | | | | | | |
measured in cut |b|1.36|0.12| |b|1.38 |0.15 | | | | | | | |
An average barrow | | | | | | | | | | | | | | |
load of clay is | | | | | | | | | | | | | | |
2.15 cu. ft. | | | | | | | | | | | | | | |
measured in cut |c|1.59|0.23| |c|1.60 |0.22 | | | | | | | |
|d|1.83|0.24| |d|1.78 |0.18 | | | | | | | |
|e|2.08|0.25| |e|2.05 |0.27 | | | | | | | |
|f|2.23|0.25| |f|2.23 |0.18 | | | | | | | |
-----------------------------------------------------------------------------
Time | Complete | | | | | Detail | | | | |
| Operations | E | F | G | H | Operations |I | J | K | L | M
------+-------------+---+---+---+----+-------------+--+-----+-----+----+-----
7 A.M.|Commenced | | | | | | | | | |
|loading sand | | | | | | | | | |
9.02 |43 loads |122| |122|2.84|a--Filling |4 |1.240|0.094|13.2|
|wheeled to a | | | | | barrow with | | | | |
|distance of | | | | | sand | | | | |
|50 ft. | | | | | | | | | |
9.50 |Picking | 48| | | |b--Starting |4 |0.182| | |
|hard clay | | | | | | | | | |
11.39 |29 loads clay|109| | | |c--Wheeling |4 |0.225| | |0.450
|wheeled to a | | | | | full--50 ft.| | | | |
|distance of | | | | | | | | | |
|50 ft. | | | | | | | | | |
11.46 |Picking clay | 7|55 | |1.67|d--Dumping |4 |0.172| | |
|again |
|