FREE BOOKS

Author's List




PREV.   NEXT  
|<   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35  
36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60   >>   >|  
alue of labor in England and America, the cost per lineal foot of the iron tubular bridges could not be less (for the average span of 150 feet) than three hundred dollars. 5280 feet by $35 is $184,800.00 5280 feet by 300 is $1,584,000.00 The six per cent. interest on the first is $11,088.00 The six per cent. interest on the second is $95,040.00 And the difference is $83,952.00 or nearly enough to rebuild the wooden bridges once in two years; and ten years is the shortest time that a good wooden bridge should last. The reader may wonder why such structures as the bridge over the Susquehanna at Columbia, which consists of twenty-nine arches, each two hundred feet span, the whole water-way being a mile long, and many other bridges spanning large rivers, and having an imposing appearance, are not referred to in this place. The reason is this: _large_ bridges are by no means always _great_ bridges; nor do they require, as some seem to think, skill proportioned to their length. There are many structures of this kind in America, of twenty, twenty-five, or thirty spans, where the same mechanical blunders are repeated over and over again in each span; so that the longer they are and the more they cost, the worse they are. It does not follow, because newspapers say, "magnificent bridge," "two million feet of timber," "eighty or one hundred tons of iron," "cost half a million," that there is any merit about either the bridge or its builder; as one span is, so is the whole; and a bridge fifty feet long, and costing only a few hundreds, may show more engineering skill than the largest and most costly viaducts in America. Few bridges require more knowledge of mechanics and of materials than Mr. Haupt's little "trussed girders" on the Pennsylvania Central Road,--consisting of a single piece of timber, trussed with a single rod, under each rail of the track. Again, as regards American iron bridges, the same result is found to a great extent. Thus, Mr. Roebling's Niagara Railroad Suspension-Bridge cost four hundred thousand dollars, while a boiler-plate iron bridge upon the tubular system would cost for the same span about four million dollars, even if it were practicable to raise a tubular bridge in one piece over Niagara River at the site of the Suspension Bridge. Strength and durability, _with the utmost economy_, seem to have been attained by Mr. Wendel Bollman, superintendent of the road-department of the Balt
PREV.   NEXT  
|<   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35  
36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60   >>   >|  



Top keywords:

bridges

 
bridge
 

hundred

 
twenty
 

million

 

tubular

 
America
 

dollars

 

Niagara

 

require


Bridge

 
structures
 

wooden

 

Suspension

 

timber

 

interest

 

trussed

 
single
 

knowledge

 

materials


mechanics

 

magnificent

 

eighty

 

builder

 

largest

 
costly
 
viaducts
 

engineering

 
costing
 

hundreds


Strength
 

practicable

 

durability

 

utmost

 
superintendent
 

department

 

Bollman

 

Wendel

 
economy
 

attained


system

 
Pennsylvania
 

Central

 

consisting

 

American

 
result
 

thousand

 
boiler
 

Railroad

 

Roebling