FREE BOOKS

Author's List




PREV.   NEXT  
|<   319   320   321   322   323   324   325   326   327   328   329   330   331   332   333   334   335   336   337   338   339   340   341   342   343  
344   345   346   347   348   349   350   351   352   353   354   355   356   357   358   359   360   361   362   363   364   365   366   367   368   >>   >|  
f cages and engines. In such cases the engines may be placed in line on opposite sides of the pit, or at right angles to each other. It is said that the output of single shafts has been raised by this method to 3500 and 4500 tons in the double shift of sixteen hours. It is particularly well suited to mines where groups of seams at different depths are worked simultaneously. Some characteristic figures of the yield for British collieries in 1898 are given below:-- Albion Colliery, South Wales 551,000 tons in a year for one shaft and one engine. Silksworth Colliery, 535,000 tons in a year for shaft Northumberland 580 yds. deep, two engines. Bolsover Colliery, Derby 598,798 tons in 279 days, shaft 365 yds. deep. Denaby Main Colliery, Yorkshire 629,947 tons in 281 days, maximum per day 2673 tons. At Cadeby Main colliery near Doncaster in 1906, 3360 tons were drawn in fourteen hours from one pit 763 yds. deep. The tub when brought to the surface, after passing over a weigh-bridge where it is weighed and tallied by a weigher specially appointed for the purpose by the men and the owner jointly, is run into a "tippler," a cage turning about a horizontal axis which discharges the load in the first half of the rotation and brings the tub back to the original position in the second. It is then run back to the pit-bank to be loaded into the cage at the return journey. Coal as raised from the pit is now generally subjected to some final process of classification and cleaning before being despatched to the consumer. The nature and extent of these operations vary with the character of the coal, which if hard and free from shale partings may be finished by simple screening into large and nut sizes and smaller slack or duff, with a final hand-picking to remove shale and dust from the larger sizes. But when there is much small duff, with intermixed shale, more elaborate sizing and washing plant becomes necessary. Where hand-picking is done, the larger-sized coal, separated by 3-in. bar screens, is spread out on a travelling band, which may be 300 ft. long and from 3 to 5 wide, and carried past a line of pickers stationed along one side, who take out and remove the waste as it passes by, leaving the clean coal on the belt. The smaller duff is separated by vibrati
PREV.   NEXT  
|<   319   320   321   322   323   324   325   326   327   328   329   330   331   332   333   334   335   336   337   338   339   340   341   342   343  
344   345   346   347   348   349   350   351   352   353   354   355   356   357   358   359   360   361   362   363   364   365   366   367   368   >>   >|  



Top keywords:
Colliery
 

engines

 
larger
 

remove

 

picking

 

smaller

 
raised
 

separated

 
character
 
discharges

classification

 

cleaning

 

consumer

 

operations

 

nature

 
extent
 

despatched

 

journey

 

original

 

return


loaded

 

position

 
vibrati
 

rotation

 
generally
 

brings

 
subjected
 

process

 

elaborate

 
sizing

washing
 

screens

 

leaving

 

carried

 

spread

 

travelling

 

passes

 

intermixed

 

screening

 

simple


partings

 

finished

 

stationed

 
pickers
 
horizontal
 

depths

 

worked

 

simultaneously

 

groups

 
sixteen