FREE BOOKS

Author's List




PREV.   NEXT  
|<   70   71   72   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   >>  
ered.| | | Total solids. | 109 | 125 | 141 | 132 Loss on ignition. | 33 | 21 | 29 | 23 Chlorine. | 32 | 44 | 42 | 43 Oxygen required | | | | for 15 minutes. | 2.56 | 0.76 | 0.27 | 0.79 Oxygen required | | | | for three hours. | 4.27 | 0.79 | 0.50 | 1.00 Free ammonia. | 2.20 | 0.88 | 0.50 | 0.92 Albuminoid am- | | | | monia. | 0.32 | 0.17 | 0.092 | 0.19 _____________________|_____________|___________|___________|__________ The electrical shoot was built in brick and contained 28 cells arranged in series. Each cell contained 13 cast iron plates 4 in. x 2 ft. 8 in. x 1/2 in. thick connected in parallel. The available electrode surface in each cell was 256 sq. ft. The ampere hour treatment required for Salford was found to be about 0.37 ampere hours per gallon, and the I.H.P. per million gallons based on these figures would be 37. NOTE.--In estimating for the plant necessary for treating the whole of the Salford sewage, a margin was allowed on above figures. The A.H.T. was taken at 0.4 and the I.H.P. per million at 39 to 39.5. Mr. Octavius March, electrical engineer, who has followed the process from the commencement, and who superintended the electrical details both at Crossness and Salford, will give you on the blackboard a rough sketch of the above trial plant. The Salford tanks are admirably adapted to the application of the electrical or in fact any process of precipitation. They are 12 in number, and it is proposed to take two end tanks for the electrical channels, in which the iron electrodes would be placed. The total I.H.P. required for treating the whole of the Salford and Pendleton sewage, taken at 10,000,000 gallons per 24 hours, is calculated at 400 I.H.P., based on the actual work done during the trial. The electrical plant would consist of four engines and dynamos, any three of which could do the whole work, and three boilers, each of 200 I.H.P. The total cost of plant, including alterations, is estimated at L16,000, to which must be added the cost of about 5,000 tons of iron plates--ordinary cast iron--at say L4 per ton. These plates would
PREV.   NEXT  
|<   70   71   72   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   >>  



Top keywords:
electrical
 

Salford

 

required

 
plates
 

ampere

 

process

 

treating

 

sewage

 
figures
 
gallons

million

 

Oxygen

 

contained

 

number

 

precipitation

 

channels

 

proposed

 

application

 

blackboard

 
Crossness

sketch
 

adapted

 
admirably
 

ignition

 

boilers

 

dynamos

 

engines

 
estimated
 
including
 

alterations


consist
 

Pendleton

 

details

 

electrodes

 

ordinary

 

solids

 

actual

 

calculated

 

treatment

 

gallon


Albuminoid

 

surface

 

series

 
electrode
 

parallel

 

connected

 

ammonia

 

Octavius

 

Chlorine

 

engineer