h and broken off the corporation cock or destroyed the goose neck. After the pipe is covered with 18 inches of refill and tunnels have been filled, water can be run in the trench and will settle the refill. There are a number of special points concerning water services and taps at mains that should not be overlooked. Take for example a water service pipe which must be run through ground where electricity is escaping under trolley tracks, around power houses, etc. The electricity will enter the pipe and wherever it leaves the pipe a hole is burned. The surface of the pipe in a short time will be full of small pith marks and will soon leak. A good way to add to the life of the pipe under these conditions is to make a star of copper and solder it on to the pipe in the street. Another piece of copper should be put on the pipe near the building. The electricity will leave the pipe by way of the points on the star. This method may not be a cure for electrolysis, but will add to the life of the pipe. Another method employed is to put the pipe in the center of a square box, then fill the box with hot pitch. When this is hardened the pipe will have a covering that will keep out any moisture and bar electricity to a marked degree. MATERIALS USED.--Galvanized steel pipe does not last under ground. Galvanized iron, heavy lead, and brass are used. Wooden pipes were once used and stood years of service. No service smaller than 1-1/4 should be used. When the water service pipe passes through the foundation wall, the pipe should not be built in, but a small arch should be built over the pipe or a piece of XX cast-iron pipe can be used as a sleeve (Fig. 44). [Illustration: FIG. 44.--Free space around pipe passing through wall.] POINTS TO REMEMBER.-- SEWER INSTALLATION _First_, select good sound pipe and fittings. _Second_, locate branch connection in street sewer. _Third_, lay out run of house sewer. _Fourth_, take out necessary permits from departments of sewer. _Fifth_, dig trench in the street, then into the house. _Sixth_, lay pipe and cement joints. _Seventh_, refill trench, tamping every foot. _Eighth_, cast-iron pipe for sewer is found under another heading. WATER SERVICE _First_, take out necessary permits. _Second_, list material and deliver to job. _Third_, lay out and dig trench. _Fourth_, have main tapped. _
PREV.   NEXT  
|<   50   51   52   53   54   55   56   57   58   59   60   61   62   63   64   65   66   67   68   69   70   71   72   73   74  
75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   >>   >|  



Top keywords:
service
 

trench

 

electricity

 

street

 

refill

 

ground

 
Another
 
copper
 
method
 

Second


Fourth

 

points

 

permits

 
Galvanized
 

Wooden

 

foundation

 

passes

 

sleeve

 

smaller

 

locate


Eighth

 

tamping

 

Seventh

 

cement

 
joints
 

heading

 

tapped

 

deliver

 
material
 

SERVICE


POINTS

 

REMEMBER

 
passing
 

Illustration

 
INSTALLATION
 

connection

 

departments

 

branch

 
select
 

fittings


overlooked
 
services
 

escaping

 

leaves

 

houses

 

trolley

 
tracks
 

special

 

destroyed

 

corporation