FREE BOOKS

Author's List




PREV.   NEXT  
|<   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45  
46   47   48   49   50   51   52   53   54   55   56   57   58   59   60   61   62   63   64   65   66   67   68   69   70   >>   >|  
county lines coming within the limits of such map, with the name of each plainly marked close to and parallel with such lines; the title, the name or number of the mine, or both, the township and county in which located; the section lines, with the number of each, marked plainly within the sections; the location of the mine openings, railroad tracks, public highways, oil and gas wells, magazines and buildings, and plainly marked with name of each; the location and extent of the excavations and connection with the surface survey; the direction of the air current, or air currents by arrows; the location and extent, so far as known or obtainable, of the excavation of any other mine or mines within the limits of the map; the boundary lines of the tracts of coal owned or leased within the limits of the map; the elevation of the floor of the excavation, above mean tide at Sandy Hook, at or near the boundary line or lines of the coal owned or leased where the coal is adjacent to coal owned by a person, firm or corporation, other than the owner or lessee of such mine, and where the excavations of such mine cease or may be approached by another mine, at points not exceeding three hundred feet apart, and referenced to some permanent monument near the main opening of such mine, and shown on the map and plainly marked bench mark, with the elevation of same. (Sec. 904, 917, 936, 937; Penalty, Sec. 976.) Sec. 936. [=Addition to map, and certificate of engineer and mine-foreman.=] The owner, lessee or agent of a mine shall cause to be made, a map or an addition to the next previous map thereof, annually, and semi-annually if so directed in writing by the chief inspector of mines, showing the excavations and the information required by the preceding section, to date of survey. The map, or maps, required by this and the preceding section, and any addition thereto, shall have the certificate of the engineer making same, and of the mine-foreman in charge of the mine at the time of the survey, acknowledged before, a notary public or justice of the peace, thereon in the following form: I, the undersigned, hereby certify that this map is correct, and shows all the information required by section nine hundred and thirty-five of the General Code, and covers the period ending .............................................. .............................
PREV.   NEXT  
|<   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45  
46   47   48   49   50   51   52   53   54   55   56   57   58   59   60   61   62   63   64   65   66   67   68   69   70   >>   >|  



Top keywords:
section
 
plainly
 
marked
 

location

 

required

 
survey
 
limits
 

excavations

 

preceding

 

leased


boundary

 
elevation
 

hundred

 

excavation

 
addition
 

information

 

annually

 

foreman

 

engineer

 

certificate


lessee

 

number

 

public

 

extent

 

county

 
writing
 
directed
 

showing

 
coming
 

parallel


inspector

 

thereof

 

township

 

located

 

sections

 
previous
 

thereto

 

making

 

correct

 

certify


thirty

 

period

 
ending
 

covers

 

General

 
undersigned
 
acknowledged
 

charge

 

Addition

 
notary