FREE BOOKS

Author's List




PREV.   NEXT  
|<   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160   161   >>  
l-State-local efforts to accelerate land-use adjustment and land treatment in the Basin. b. Adoption by State, county and municipal governments of good strong statutes and ordinances for the control of erosion from construction sites and other sources in urban areas. c. Completion of current experiments on Rock Creek in the reduction of storm water turbidity by means of coagulants, and extension of such research to the Potomac estuary. [Illustration] B. With primary reference to problems of water supply and flood damage in the Basin, steps must be taken to cope with present or looming municipal and industrial demands and to guard against future troubles: 1. Large-scale or general problems call for large or general actions: a. We recommend that major Basin water supply problems, including the need for some storage to restore and protect the quality of the water in the flowing rivers and the needs for flat-water recreation, be dealt with as follows: (1) By prompt funding and construction of the authorized Bloomington Reservoir on the Potomac North Branch, for benefits in that region and downstream, including the Washington metropolis. (2) By completing action on the reports on the several additional major reservoirs which, together with Bloomington, will constitute a "package" of drought insurance against the Basin's most critical expected water demands during at least the next 20 years. Three of the additional reservoirs are those on Town Creek, Little Cacapon Creek, and Sideling Hill Creek, recommended in the _Potomac Interim Report to the President_ of January 1966 and detailed in subsequent studies, for benefits in terms of downstream water supply and exceptional recreational opportunity. Another reservoir, North Mountain on Back Creek, was considered to be essential for meeting these needs by the Governor's Potomac Advisory Committee in its consideration of the 1966 _Interim Report_ and was recommended in the Corps of Engineers _Potomac River Basin Report of 1963_. Additional reservoirs include the Sixes Bridge Reservoir on the Monocacy and the Verona Reservoir on the Middle River tributary of the South Fork of the Shenandoah, also recommended in the Corps of Engineers 1963 report and currently being restudied in detail to meet prese
PREV.   NEXT  
|<   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160   161   >>  



Top keywords:

Potomac

 

supply

 

problems

 

Reservoir

 

reservoirs

 

Report

 

recommended

 
general
 

demands

 

benefits


Engineers
 

Interim

 

Bloomington

 

downstream

 
additional
 
including
 

municipal

 

construction

 

Sideling

 

Cacapon


Little

 

treatment

 

President

 

studies

 
subsequent
 

detailed

 

January

 
adjustment
 

package

 

drought


insurance

 

constitute

 

Adoption

 

exceptional

 

critical

 

expected

 

recreational

 

Middle

 
tributary
 

Verona


Monocacy

 

include

 

Bridge

 

Shenandoah

 

detail

 

restudied

 

report

 

Additional

 
accelerate
 

considered