besides the necessary crew.
100,000 Cubic Meter Fast Commercial Zeppelin.
Trans-Atlantic mail and express service.]
CHAPTER IV
The Zeppelin Organization and Facilities Today
The Zeppelin organization today is prepared to build, deliver and
operate rigid airships for any purpose. It has under contract virtually
all the competent airship personnel in Germany. Practically all the
engineering staffs and workmen employed in developing Zeppelins have
been retained, one way or another, that they may be prepared to
guarantee satisfactory performance of any Zeppelin turned out.
Actual construction work was discontinued early in 1920. The Allied
Powers so interpreted the Treaty of Versailles that the German aircraft
industry was not able to produce ships or planes having the least
possible military value. Further restrictions were defined in the London
Ultimatum. They have been enforced by the Allied Control Commission.
Research and Development Work Continues
Notwithstanding this severe handicap, the Zeppelin organizations have
been kept intact. There has been sufficient work on motor cars, motor
boats, motors, gears, aluminum foundry work, etc. to keep the workmen
occupied. Where some of the plants have been closed, the entire
personnel has been transferred into the other active organizations. In
each branch of the Zeppelin organization design and research work on
airships and aerial navigation have continued and progressed.
Zeppelin Able to Produce All Types
Luftschiffbau-Zeppelin has been particularly active in developing as far
as possible the many ideas and inventions originating before and during
the war. Many of their new airship designs have been completed, others
partly finished. It is now possible to produce quickly any type of
commercial airship from of 700,000 to 7,000,000 cubic feet (20,000 to
2,000,000 cubic meters) capacity.
[PLATE 54: 100,000 Cubic Meter Fast Commercial Zeppelin.
Trans-Atlantic mail and express service.
CONTROL and NAVIGATION CAR PASSENGER and OFFICERS' QUARTERS
For ZEPPELIN AIRSHIP Entw. 270]
Some of the principal types for which specifications have been completed
and the performance of which are guaranteed and further, backed by more
than twenty-five years of experience, include:
Plate 51 1--A 20,000 to 30,000 cubic meter fast passenger
Zeppelin, based on the =Bodensee= performance.
Plate 52
|