FREE BOOKS

Author's List




PREV.   NEXT  
|<   96   97   98   99   100   101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140   141   142   143   144   145   >>   >|  
eers, on the other hand, set forth their opinion that all damaged cylinders could be reclaimed and made as good as new. As a result of this difference of opinion, nothing was done until the larger German craft were turned over to the Navy Department to be fitted as transports, in July of 1917. It was then decided to use welding and patching on the vessels. In no cases were the repairs to the propulsive machinery delayed beyond the time necessary to equip these ships as transports. Electric and acetylene welding is not a complicated art in the hands of skilled men; for patching a hole, or filling the cavity of a great crack in a cylinder, say by electric welding, may be compared to a similar operation in dental surgery. Returning to the _Leviathan's_ faulty German construction, be it said that the opinion of the navy engineers who overhauled her, was that inferior engineering had been practised in her construction. There are on this craft four turbine engines ahead, and four astern, on four shafts. All the head engines were in good shape, but all the astern engines were damaged. But the main part of the damage had resulted more to faulty operation of the engines than to malicious damage. Cracks were found in the casing of the starboard high-pressure backing turbine, cracks of size so great as to make it certain that this engine had not been used in the last run of that vessel on transatlantic service in 1914. There was discovered on the _Vaterland_, or _Leviathan_, documentary evidence to prove this, and it also appeared from this paper that on her last trip to this country the vessel had not averaged twenty knots. It may be that the German ship-builders had hurried too swiftly in their strenuous efforts to produce a bigger, if not a better, steamship than the British could turn out. Forty-six of the _Vaterland's_ boilers showed evidence of poor handling. They were not fitted with the proper sort of internal feed-pipes. All these defects, defects original with the steamship, were repaired by the Americans. In addition, evidences of minor attempts to disable the _Vaterland_ were found, such, for instance, as holes bored in sections of suction-pipes, the holes having been puttied and thus concealed. Things of the sort afforded ample reason for a thorough overhaul of the vast mass of machinery aboard the steamship. But eventually she was ready for her test and her performance on a trial trip to southern waters showe
PREV.   NEXT  
|<   96   97   98   99   100   101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140   141   142   143   144   145   >>   >|  



Top keywords:

engines

 

steamship

 

Vaterland

 

German

 
opinion
 

welding

 

patching

 

damage

 

Leviathan

 

astern


machinery
 

turbine

 
transports
 
vessel
 

operation

 

damaged

 
construction
 

faulty

 
fitted
 
defects

evidence

 

strenuous

 

swiftly

 

bigger

 
produce
 
efforts
 

country

 

discovered

 

documentary

 

service


transatlantic

 
appeared
 

builders

 

hurried

 

twenty

 
averaged
 

afforded

 

reason

 
overhaul
 

Things


concealed

 

suction

 

puttied

 
southern
 

waters

 

performance

 

aboard

 

eventually

 

sections

 

handling