ward casing; eight hundred and seventy-six cubic feet of Mylnefield stone in the hearting; one hundred and four tons of solid contents; one hundred and thirty-two superficial feet of hewing in the face-work; four thousand five hundred and nineteen superficial feet of hewing in the beds, joints, and joggles; four hundred and twenty lineal feet boring of trenail holes; three hundred and seventy-eight feet lineal cutting for wedges; two hundred and forty-six oaken trenails; three hundred and seventy-eight oak-wedges in pairs. In the work-yard about sixty men were employed in hewing and preparing the various courses of the solid part of the building. The second course, which contained some very weighty stones, was laid down upon the platform in the middle of the yard, each stone being carefully fitted and marked as it was to lie in the building. By the end of this season the building was brought to a level with the highest part of the margin of the foundation pit, or about five and a half feet above the lower bed of the foundation-stone. The number of hours work upon the rock this season at low water amounted to about two hundred and sixty-five, of which number only eighty were employed in building. The third season was commenced early in the spring of 1809. The first works consisted in laying down mooring-chains with floating-buoys, for mooring the stone-lighters and praam-boats; the beacon was also fitted out as a more permanent residence for the workmen, in order to lessen the amount of sickly motion which is so distressing to landsmen in a rough sea. By the end of June the men were able to work upon the masonry while the rock was under water; and on the 8th July, for the first time, the tide ceased to overflow the building at low water. With considerable exertion the solid part of the building, which reached to the height of thirty feet, was completed by September. By continuing the works a month or two longer a much greater height might have been attained, but as the engineer foresaw that a diligent employment of the next season would suffice for the completion of the work, he deemed it advisable to leave the house in its present solid defensible posture, on which the sea had much less hold, than if part of the hollow portion had been built. The winter months were occupied in preparing the upper courses; but in consequence of severe frosts, several excellent and valuable stones from the Mylnefield quarry were
PREV.   NEXT  
|<   71   72   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95  
96   97   98   99   100   101   102   103   104   105   106   107   108   109   110   111   112   113   >>  



Top keywords:
hundred
 

building

 

season

 
seventy
 
hewing
 

fitted

 
courses
 

stones

 
number
 

preparing


mooring

 

foundation

 

height

 

Mylnefield

 

superficial

 

thirty

 
lineal
 

employed

 

wedges

 

September


completed

 
continuing
 

greater

 

attained

 

casing

 
reached
 

longer

 

masonry

 

distressing

 

landsmen


hearting

 

overflow

 

engineer

 

considerable

 

ceased

 
exertion
 
winter
 

months

 

occupied

 

portion


hollow

 

consequence

 

valuable

 
quarry
 

excellent

 
severe
 

frosts

 

suffice

 

completion

 

diligent