FREE BOOKS

Author's List




PREV.   NEXT  
|<   208   209   210   211   212   213   214   215   216   217   218   219   220   221   222   223   224   225   226   227   228   >>  
rs from the projectors and supporters of the Company followed, with other leaders, the result being that the Darien Canal never went beyond a project. Presently also the rush for California abated, and the railway met the wants of the passengers; all the canal schemes were therefore again shelved for a time. Then came an almost Utopian project for a ship railway, the cars of which would run down into the water, take up the largest vessel, and carry it over without trouble or difficulty. This met with little encouragement, and was soon dropped. In 1879 Ferdinand de Lesseps, who had achieved such a glorious success with the Suez Canal, took up the matter of a canal between the two oceans, and summoned a congress of savants, engineers and seamen, to inquire into and discuss the questions of its possibility, and of the most suitable place for its excavation. A number of projects were considered, among them that of Dr. Cullen, brought forward by M. de Puydt, which, however, did not receive much attention, as there was a difference of opinion as to the reliability of the figures. The schemes were ultimately reduced to two--those for the Nicaragua and Panama routes. The position of the great lake caused the former to be thoroughly discussed; but there were several almost insurmountable difficulties in the way of its adoption. To clear the San Juan river, and make it into a great canal, would entail great labour and expense, and then seven or eight locks would be required. On the Pacific side locks would also be required for the Rivas, while the harbours of Greytown on the Gulf side, and Brito on the Pacific, were quite unsuited as termini for a canal. The total length would be 182-1/2 miles, and the time occupied in the passage four and a half days. There was also another great draw-back: Nicaragua was and is subject to earthquakes, which would be likely at times to interfere greatly with such heavy works as were required. It followed, therefore, that notwithstanding the powerful support of the Americans, this line was abandoned in favour of that from Port Simon to Panama, not far from the railway. Two French officers, MM. Wyse and Reclus, had explored the country, and proposed to carry the canal through the Chagres river, and thence, by means of a great tunnel, into the valley of the Rio Grande; but, on consideration, the tunnel was abandoned in favour of a deep cutting, which would not exceed 290 feet. The great obje
PREV.   NEXT  
|<   208   209   210   211   212   213   214   215   216   217   218   219   220   221   222   223   224   225   226   227   228   >>  



Top keywords:

railway

 

required

 
favour
 
abandoned
 

Pacific

 
Panama
 

schemes

 
project
 
Nicaragua
 

tunnel


termini
 
unsuited
 

insurmountable

 

occupied

 
passage
 

length

 
harbours
 

entail

 

expense

 

adoption


labour

 

difficulties

 

projectors

 

Greytown

 

country

 

explored

 

proposed

 

Chagres

 
Reclus
 

French


officers

 
exceed
 

cutting

 

valley

 

Grande

 

consideration

 

earthquakes

 

discussed

 

subject

 

interfere


greatly

 

Americans

 

support

 

powerful

 

notwithstanding

 
encouragement
 
dropped
 

trouble

 

difficulty

 

Ferdinand