FREE BOOKS

Author's List




PREV.   NEXT  
|<   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56  
57   58   59   60   61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   >>   >|  
on, while the third consisted of sedimentation and coagulation. The sedimentation tank was of sufficient size, when compared with the area of the experimental slow sand filter, to represent the Georgetown and McMillan Park Reservoirs when used in connection with the large filters. The first preliminary filter was very similar in construction and operation to a mechanical filter. The sand for this filter was taken from the main filters, and, consequently, was finer than is generally used in mechanical filters. The second preliminary filter was a Maignen scrubber. It consisted of a cylindrical concrete tank, 4 ft. in diameter and 8-1/2 ft. deep, which contained 12 in. of cobble-stones on the bottom, then, successively, 12 in. of egg-size coke, 12 in. of stove-size coke, 24 in. of nut-size coke, and 24 in. of sponge clippings as the final or top layer. ~Table 14--Cost Per Million Gallons Filtered.~ (_A_) ~Labor~. =============+===========+==========+================== | Office | | ~Filter~ | and | Pumping | ~operations~: Month. |laboratory.| station. +------------------ | | | Sand |Repairs | | |handling.| etc. -------------+-----------+----------+---------+-------- 1909. -------------+-----------+----------+---------+-------- July | $0.73 | $0.57 | $0.86 | ... August | 0.75 | 0.64 | 0.59 | ... September | 0.83 | 0.67 | 0.80 | ... October | 0.72 | 0.66 | 0.73 | ... November | 0.87 | 0.76 | 0.42 | ... December | 0.90 | 0.69 | 0.27 | ... -------------+-----------+----------+---------+-------- 1910. -------------+-----------+----------+---------+-------- January | 0.81 | 0.63 | 0.33 | ... February | 0.94 | 0.74 | 0.35 | $0.07 March | 0.92 | 0.81 | 0.30 | 0.07 April | 0.93 | 0.83 | 0.49 | 0.03 May | 0.86 | 0.72 | 0.36 | 0.03 June | 0.88 | 0.67 | 0.38 | ... -------------+-----------+----------+---------+-------- Average | 0.84 | 0.70 | 0.27 |[1]0.25 -------------+-----------+----------+---------+-------- Fiscal years: -------------+-----------+----------+---------+---
PREV.   NEXT  
|<   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56  
57   58   59   60   61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   >>   >|  



Top keywords:
filter
 

filters

 

mechanical

 

preliminary

 
sedimentation
 
consisted
 

August

 
October
 

September

 

operations


Pumping

 

Filter

 
Office
 

laboratory

 
station
 
handling
 

Repairs

 

Fiscal

 
Average
 

December


November

 

January

 

February

 
sponge
 

operation

 
construction
 

similar

 

generally

 

compared

 

sufficient


coagulation

 

experimental

 
Reservoirs
 

connection

 

McMillan

 

represent

 
Georgetown
 
Maignen
 

scrubber

 

clippings


Million

 

Gallons

 

successively

 

diameter

 
concrete
 

cylindrical

 
bottom
 

stones

 
cobble
 

contained